Ekton Project Analytics ->Training Course

Earned Value Professional (EVP) Exam Preparation for oil and gas professionals

Master Earned Value Management Techniques and Boost Your Career in the Oil & Gas Industry

Ekton Project Analytics ->Training Course

PMP Exam Preparation Designed for Oil and Gas Projects Industry Professionals

Become a Certified Project Leader in Oil and Gas – Tailored PMP Prep for Industry Success

About The Training Course

This course is tailor-made for oil and gas professionals who want to take their project management skills to the next level. Whether you’re a Project Manager, Cost Engineer, or a Planner, this training equips you with the essential tools and knowledge to excel in a competitive industry. As oil and gas projects become increasingly complex, the demand for professionals who can manage costs, schedules, and scope with precision is higher than ever. Position yourself as a leader in project controls and gain recognition that opens doors to exciting career opportunities

All our instructors are AACEI certified Earned Value Professionals (EVP) with vast experience managing complex oil and gas projects. They can provide training in English, French, or Portuguese

Training hours packages available:

  1. 20 hours
  2. 40 hours
  3. 80 hours

Training Plan Summary

Session 1: Introduction and Overview

  1. The need for EVM.
  2. The role of EVM: Project controls
  3. Characteristics of EVM
  4. EVM terminology
  5. History of EVM

Session 2: Critical Components for Effective Earned Value Management (EVM)

  1. Planning for Earned value Management
  2. Key Stages in EVM Implementation

Session 1: Scope Management

  1. Defining the work to be done
  2. Work breakdown structure
  3. WBS terminology
  4. WBS principles
Session 1: Project Scheduling
  1. EVM scheduling requirements
  2. Master schedule
  3. Vertical integration
  4. Horizontal integration
  5. An oil and gas schedule example 

Session 1: Control Accounts

  1. Control account plans.
  2. The role of CAPs.
  3. Planning and Implementing Risk Responses: Real-World Examples.
  4. Monitoring and Controlling Risks: Contingency Planning.
  5. CAP ingredients
  6. CAP size and number
  7. The CAP rule
  8. Detailed example for CAP in oil and gas

Session 1: Performance Measurement

  1. Establishing an EV measurement baseline
  2. Questions answered by the baseline
  3. Planning and measuring earned value
  4. Establishing an EV measurement system
  5. Considerations for choosing a measurement method
  6. Methods used to plan and measure EV
  7. Example CAP with EV measures
  8. Project cost baseline
  9. PMB components
  10. Managing change

Session 1: Monitoring and Control

  1. Monitoring at task level
  2. Trend indicators
  3. Management by exception
  4. Cost performance index and using the CPI
  5. Schedule performance index and using the SPI
  6. Using Cumulative vs. periodic data

Session 1: Forecasting

  1. Factors determining project results
  2. Statistical forecasts
  3. Estimate at complete
  4. To complete performance index
  5. Schedule forecasting - EACt

Session 2: EVM criteria review

  1. EVM Overview
  2. Implementing EVM in oil and gas
Download the Training Course

Why Choose this Training Course?

Industry-Specific Focus

Tailored examples and case studies specific to the oil and gas sector, covering offshore drilling, pipeline development, and refinery construction projects.

Led by Industry Experts

Instructors are seasoned professionals with both EVP certification and extensive experience in managing oil and gas projects.

Comprehensive Exam Preparation

Detailed instruction on all EVP exam domains with mock exams designed to mimic the real exam environment, focusing on the complexities of oil and gas scheduling.

Flexible Learning Options

Choose from live virtual sessions, on-demand learning, or a blended approach to fit your busy schedule, whether you’re in the office or on a rig.

Pricing Plan

EKTAtivo 2

Standard User Proficiency

$ 4.000 / 40 hours
  • Blended learning
  • Customized to your needs
  • Training Materials
  • 2 x (EVP Mock Exams)
  • Implementing EVM in an Oil & Gas Project

Advanced Consultant Training

$ 8.000 / 80 hours
  • Blended learning
  • Customized to your needs
  • Training Materials
  • 4 x (EVP Mock Exams)
  • Oil & Gas Projects templates
  • Implementing ESM in Two Oil & Gas Projects
  • Implementing EVM in an Oil & Gas Projects
EKTAtivo 2

Fundamentals Overview

$ 2.000 / 20 hours
  • Blended learning
  • Customized to your needs
  • Training Materials
  • Templates
  • EVP Mock Exam